What is the Purpose of the Sewer/Storm Drain Connection Permit Bond?

The City of Los Angeles requires contractors performing sewer and storm drain connections in the city to obtain a Sewer/Storm Drain Connection Permit Bond. The bond represents a financial guarantee by the contractor and the issuing surety company to the City of Los Angeles that all contracted work will be completed on time and the jobsite will be returned to its original condition.

How Much Does the Bond Cost?

Per Municipal Code 64.15.1, applicants shall deposit with the city a bond in an amount no less than $10,000. 

The bond cost for the contractor is typically between 1%-7.5% depending on the contractor’s personal credit score.

Bond Amount Bond Cost*
$10,000 $100-$750
$10,000+ 1%-7.5%

*Prices shown are based on several factors. Not all available pricing tiers are shown. Rates do not constitute an offer of bonding and are subject to change at any time.

How Does the Permit Application Process Work With the City of Los Angeles?

All applications for sewer/storm drain connections must be submitted to the City of Los Angeles Bureau of Engineering for review and approval. Each application must incline a plan showing the location and dimensions of the proposed project.

Does CCIS File the Bond for Applicants?

City of Los Angeles requires wet signatures** on filed bond documents. This means both parties must physically sign the bond prior to sending it in to the City of Los Angeles. The original bond form issued by CCIS needs be mailed to or dropped off at the following location by the contractor once signed:

City of Los Angeles
200 N Spring Street
Los Angeles, CA 90012

**Properly review bond forms to confirm if notarization is required. Failure to adhere to document requirements may lead to rejection of the bond form by the City of Los Angeles.

Does This Bond Expire?

The permit bond expires upon the specified expiration date, typically one year from the date of issuance. A new permit bond will need to be purchased should the project take longer than one year.

Claims Information

If the City of Los Angeles files a claim against the Sewer/Storm Drain Connection Permit Bond, the Surety company will investigate the legitimacy of the claim and proceed accordingly. CCIS does not handle surety claims in office, however, claims contact information will be provided to the contractor, to move the claims process forward.

If the claim is found to be legitimate, the Surety company will payout to the City of Los Angeles, up to the limit of the bond. 

Unlike insurance policies that protect contractors from unforeseen events, this bond protects the City of Los Angeles, its laborers, and suppliers from the actions of a contractor. Contractors are responsible for their actions and therefore must reimburse the Surety company for any claims paid. Failure to do so will significantly inhibit a contractor’s ability to obtain a surety bond for future jobs. 

Permit Bond Search

City of Los Angeles Sewer/Storm Drain Connection Permit Bond Form
City of Los Angeles Sewer/Storm Drain Connection Permit Bond Form
State/Jurisdiction: California